|
![]() |
Philville |
Post Reply ![]() |
Author | |
tom d ![]() Senior Member ![]() Joined: Nov 15 2008 Location: lakewood,ca Status: Offline Points: 156 |
![]() ![]() ![]() ![]() ![]() Posted: Jun 10 2011 at 7:34pm |
6-12-11, Tom D took an old transfer table that keeps getting moved around as it was just too good to throw out and put it over the drain channel by the fences along the railroad track. This is the same channel that goes in front of the club house. I had some broken up cement walk ways that Phil and I stacked up and set the ends of the ( new bridge] to Philville on. There is still a lot of fill to add and some adjustments but its a start.
I will need to build a Y switch to go in by the trestle and miss Joe's apple tree when setting the track that will make a s curve to the main line from Philville but I think it will look good when done. Tom D. Edited by PhilC - Jun 11 2011 at 7:11pm |
|
![]() |
|
Sponsored Links | |
![]() |
|
tom d ![]() Senior Member ![]() Joined: Nov 15 2008 Location: lakewood,ca Status: Offline Points: 156 |
![]() ![]() ![]() ![]() ![]() |
tom downing measured from where the Y switch will be no the main line to the front of phils contaner and came up with 150 feet,should be fun running trains back there when we get the track in.
|
|
![]() |
Post Reply ![]() |
|
Tweet
|
Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |