The Train Gallery of Tom Downing
Tom has 1078 images online
|

A lot of digging |

Remove switch’s to get rid of the ruff track |
|

The first replacement water tank |

New water tower base being installed |
|

Old water tower coming down |

PE pole |
|

The type of caboose Andrew is planning to build |

Caboose Frame cabin support welded on |
|

Caboose center beam is all welded up |

Caboose frame getting painted |
|