|
Send
this image as an E-Postcard to a friend. Click
HERE |
|
Picture
Title: |
New steel rail |
Location: |
|
Photographer: |
Tom Downing |
Submission
Date: |
7/10/2023 8:22:10 AM |
Comments: |
Some of the new steel rail staged close the maintenance shop. Each end will need to have two 3/16 holes drilled in it. That’s 6,400 holes to be drilled for the joint bars before it can be installed. |
Gallery Category: |
Track Construction |
Technical
Information: |
Shooting Location: |
|
Owner: |
|
Locomotive Name or Road: |
|
Locomotive or Car Type: |
|
Whyte Classification |
Numeric: Name: Layout: Class: |
Track Gauge: |
7.5 |
Scale: |
|
|
|