|
Send
this image as an E-Postcard to a friend. Click
HERE |
|
Picture
Title: |
ties new ties layed out |
Location: |
main yard |
Photographer: |
Tom Downing |
Submission
Date: |
10/26/2014 9:24:59 PM |
Comments: |
the old wood ties on one of the yard track let go and the rails spread on the last run day and one of the box cars landed on its side. so tom came out and spent the afternoon replacing them with new and some reused plastic ties theres still more to do but it will take afew more afternoons |
Gallery Category: |
Track Construction |
Technical
Information: |
Shooting Location: |
main yard |
Owner: |
|
Locomotive Name or Road: |
|
Locomotive or Car Type: |
|
Whyte Classification |
Numeric: Name: Layout: Class: |
Track Gauge: |
7.5 |
Scale: |
|
|
Photo
Comments: |
Critiqued
12/2/2015 4:07:32 AM by
Andrew Andrew, BZ6j6ERLElCw
|
im making a tunenl im making a tunenl for my railroad. it wont look as good as foam but it will still look good. im about half way through. first u get chicken wire and make the frame of the tunenl. then u make the first layer with PAPER MACHE. after that first layer dries u put on a second layer as reinforcement. u can put on as many layers as u want as long as u have enough stuff. when that dries u paint it then secure it down where u want. make sure u can get it back up so u can change that track if u want to. |
|
|
|