|
Send
this image as an E-Postcard to a friend. Click
HERE |
|
Picture
Title: |
New switch |
Location: |
|
Photographer: |
Tom Downing |
Submission
Date: |
9/10/2020 8:53:43 PM |
Comments: |
Rory removed the old lefthand switch and installed a righthand switch. He then realigned the tracks. This makes a much smoother transition for the trains, Tom built the switches |
Gallery Category: |
Track Construction |
Technical
Information: |
Shooting Location: |
|
Owner: |
|
Locomotive Name or Road: |
|
Locomotive or Car Type: |
|
Whyte Classification |
Numeric: Name: Layout: Class: |
Track Gauge: |
7.5 |
Scale: |
|
|
|