Send
this image as an E-Postcard to a friend. Click
HERE |
|
Picture
Title: |
Switch installed |
Location: |
|
Photographer: |
Tom Downing |
Submission
Date: |
3/28/2021 4:51:19 PM |
Comments: |
This is the second switch Tom installed in this area. When the connection track is installed trains will be able to go from the outer loop over to the inner loop. This allows more options for train operators on public run days. The big one is trains will be able to get back to the station if something is blocking to track on the other side of the tunnel. We are calling this the cut off track. |
Gallery Category: |
Track Construction |
Technical
Information: |
Shooting Location: |
|
Owner: |
|
Locomotive Name or Road: |
|
Locomotive or Car Type: |
|
Whyte Classification |
Numeric: Name: Layout: Class: |
Track Gauge: |
7.5 |
Scale: |
|
|