Southern California Live Steamers - Miniature Railroad Photography By: Photography By: Photography By: Photography By:
Copyright 2009, Absolute Internet, Inc. All Rights Reserved.
 
Share |
U.S. Standard Railroad Gauge

By -

Just how did they come up with 4 feet, 8.5 inches anyway?

The US Standard railroad gauge (distance between the rails) is 4 feet, 8.5 inches. That's an exceedingly odd number. Why was that gauge used?
Because that's the way they built them in England, and the US railroads were designed by English expatriates. Why did the English people build them like that? Because the first rail lines were built by the same people who built the pre-railroad tramways, and that's the gauge they used.

Why did "they" use that gauge then? Because the people who built the tramways used the same jigs and tools that they used for building wagons, which used that wheel spacing.

Okay! Why did the wagons use that odd wheel spacing? Well, if they tried to use any other spacing the wagons would break on some of the old, long distance roads, because that's the spacing of the old wheel ruts. So, who built these old rutted roads?

The very first long distance roads in Europe were built by Imperial Rome for the benefit of their legions. The roads have been used ever since. And the ruts? The initial ruts, which everyone else had to match for fear of destroying their wagons, were first made by Roman war chariots. Since the chariots were made for, or by, Imperial Rome, they were all alike in the matter of wheel spacing.

Thus, we have the answer to the original question. The United States standard railroad gauge of 4 feet, 8.5 inches derives from the original specification for an Imperial Roman army war chariot. Specs and bureaucracies live forever. So, the next time you are handed a specification and wonder what horse's back end came up with it, you may be exactly right - because the Imperial Roman chariots were made to be just wide enough to accommodate the back ends of two war horses.

Now the twist to the story: When we see a Space Shuttle sitting on the launch pad, there are two big booster rockets attached to the sides of the main fuel tank. These are the solid rocket boosters, or SRBs. The SRBs are made by Thiokol, at a factory in Utah (very near Promontory Point!). The engineers who designed the SRBs might have preferred to make them a bit fatter, but the SRBs had to be shipped by train from the factory to the launch site. The railroad line to the factory runs through a tunnel in the mountains. The SRBs had to fit through that tunnel. The tunnel is slightly wider than a railroad track, and the railroad track is about as wide as two horses' behinds. So, a major design feature of what is arguably the world's most advanced transportation system was determined by the width of a horse's rump!
(Note: That was an intriguiging - and scary - fact about the longevity of bureaucrats and specifications!)


4975 Views as of 10/11/2008 10:37:14 PM


About the Author:

Select another Article
Click HERE
Do you have some knowledge to share?
Add your own Stories, Articles or References.
Click HERE
Comment Date: 3/20/2013 10:55:01 AM
Comment By: Mike Farrall
From: Columbia MO
This tale about the origin of US rail gauge has been shown to be False. In the interest of Internet honesty, why don't you remove it from your site?

Comment Date: 3/20/2013 10:57:03 AM
Comment By: Mike Farrall
From: Columbia MO
PS I forgot to give my source: http://www.snopes.com/history/american/gauge.asp