SCLS
Member Photo Gallery
SCLS Facilities Category
There are 273 images in this category
|
Pulled the weeds and rebuilt the drip watering system
by Tom Downing |
Heading out on Crenshaw to clean the tracks before the run day
by Tom Downing |
|
Small ore car got side boards
by Tom Downing |
Dale and Jen’s put sides on the ore cars
by Tom Downing |
|
Side boards on work cars
by Tom Downing |
New top board on the tie wall
by Tom Downing |
|
Painted our street number on the switch stand next to the caboose.
by Tom Downing |
Started painting the lettering on the side of the caboose
by Tom Downing |
|
Dale is installing railroad signs on the posts that hold up the G gauge
by Tom Downing |
Eagle Scout project, New information sign board in the station
by Tom Downing |
|
End lettering getting painted on
by Tom Downing |
Rory helped with putting on the paint mask
by Tom Downing |
|
ATSF and car number is painted on
by Tom Downing |
Ready to start painting on the yellow
by Tom Downing |
|
Logo starts to show
by Tom Downing |
Pulling the masking tape off
by Tom Downing |
|
Black is on now the white gets painted on.
by Tom Downing |
Painting the 4 + signs on the side.
by Tom Downing |
|
Third rail for 1 inch installed along the back fence
by Tom Downing |
Paint mask on ready for white paint
by Tom Downing |
|